Skip to content
Integrate Building Group logo

Home Renovations in Wollongong & the Illawarra

Get a free quote

A good renovation makes an older house work for the way you live now: walls opened up, a kitchen at the heart of the home, bathrooms you are happy to use, and a finish that looks new inside and out. We renovate homes across Wollongong and the Illawarra, from bathrooms to whole-house transformations.

We renovate bathrooms, and we build kitchens as part of larger home renovations. We look after the whole job, from design to council approval (where it is needed) and build.

We are based in Dapto, and our three directors grew up in the Illawarra. We know the local homes and what tends to be hiding behind their walls.

Renovations we take on

Whole-house renovations

A new layout, kitchen, bathrooms and floors, and a fresh exterior, often with walls opened up for open-plan living.

Bathroom renovations

A full strip-out and rebuild, with waterproofing to the Australian Standard, new tiling, vanity, shower and fittings.

Kitchens, as part of a bigger renovation

We design and build kitchens when they are part of a wider renovation, such as opening up the living areas.

Opening up living areas

Removing or moving walls, including load-bearing walls with an engineer-designed beam.

Exterior makeovers

New cladding and colours, verandahs, balustrades and stairs to give an older home a new face.

Renovate and extend

When the house needs more rooms as well as a better layout, an extension and a renovation can be one project.

Home extensions

Our work

Our renovation projects

Real photos from our own jobs.

Barrack Point: a whole-house transformation

Completed

A red-brick home turned into a bright coastal house: a white exterior, a covered verandah with new balustrades and stairs, stone around the garage, and a reworked interior with arched openings, a new kitchen and bathroom, built-in robes and new floors.

The house before the renovation: red brick, with a red roller garage door, a small balcony and concrete stairs up from the lawn Before
The house after the renovation: a white exterior, a covered verandah with white balustrades, new stairs, stone around a white garage door and a paved driveway After

Photographed from slightly different angles.

Kitchen with a fluted-tile rangehood surround, a stone-look benchtop, a gas cooktop and timber-look cabinets
The new kitchen: fluted tiles around the rangehood, a stone-look benchtop and timber-look cabinetry.
Bathroom with a floating fluted vanity, a round vessel basin, brass wall tapware and a backlit mirror
The bathroom: a floating fluted vanity, vessel basin, brass tapware and a backlit mirror.
Hallway lined with white shaker-style built-in robes and timber-look flooring, leading to a balcony with an ocean view
Shaker-style built-in robes line the hallway out to the balcony.
View through a curved archway into the kitchen area during fit-out, with cabinets in place and windows at the far end
During fit-out: the new archway, with the kitchen cabinets going in.

A kitchen and bathroom renovation

Completed

A new white kitchen with an island and a new bathroom vanity, built as part of a home renovation.

White kitchen with an island bench under exposed timber ceiling beams, a window over the sink and a stainless steel fridge
A white kitchen with an island, under the home’s exposed timber beams.
Corner vanity with a round vessel basin, a white benchtop and large grey wall tiles
A corner vanity with a vessel basin and large-format grey tiles.

OUR APPROACH

Our 3-Step Project Management Framework

From initial consultation to key handover — a proven process that gives you complete clarity and control at every stage.

Discovery & Design

We visit your site to understand your vision, then engage with our draughtsmen to get your plans drawn—ensuring every detail reflects what you want to build.

  • On-site consultation
  • Vision alignment
  • Professional plan drafting

The Specification

A second visit to review a fully broken-down specification list and your initial timeline projection. Every material, fixture, and finish—documented and transparent.

  • Detailed specification list
  • Material selections
  • Timeline projection

Finalization Roadmap

We finalize all adjustments to your project scope and provide an updated, transparent specifications sheet, a clear start date, and a defined timeline for your build.

  • Refined specifications confirmed
  • Start date projection
  • Contractual transparency

Step by step

How a renovation runs

  1. Site visit and design

    We look at the house and talk through what is not working, then work with our draughtsmen on any layout changes.

  2. Testing and engineering

    Asbestos and lead testing where needed, and an engineer for any wall that is coming out.

  3. Approval, if needed

    Exempt work goes straight ahead; structural or external changes need a CDC or DA.

  4. Contract and insurance

    You sign a written contract with the specification and start date in it. For work over $20,000 you also receive the home building insurance (HBCF) certificate before any deposit is paid.

  5. Strip-out

    Licensed asbestos removal first if it is present, then demolition, with the rooms you are still using protected.

  6. Structure and services

    Beams and framing changes, then the plumbing and electrical rough-in.

  7. Waterproofing, linings and tiling

    Wet areas are waterproofed before tiling, and new walls and ceilings are lined.

  8. Joinery and finishes

    Kitchen, vanities, robes, floors, fixtures and painting.

  9. Final inspection and handover

    Where the work was approved, the certifier issues an occupation certificate. Then we walk through the finished work with you.

Older homes: what is checked first

Most homes we renovate are decades old, and a few things need checking before any wall comes down.

Asbestos

Homes built or renovated before 1990 may contain asbestos in wall and eave sheeting, vinyl floors, behind tiles and in old fences. It is tested before work starts. Removing more than 10 square metres of bonded asbestos, or any friable asbestos, requires a licensed removalist.

Lead paint

Paint applied before 1970 can contain lead. Sanding or stripping it releases toxic dust, so it is tested and handled safely.

Load-bearing walls

Opening up a layout often means removing a wall that holds up the roof. A structural engineer sizes the beam that replaces it.

Wet areas

Old bathrooms often have failed waterproofing. A renovation is the time to fix it properly, to the Australian Standard for wet areas (AS 3740).

Hidden damage

Rot, termite damage and old wiring often only show up once walls and floors are opened, which is why a renovation budget needs a contingency.

Approvals

Does a renovation need council approval?

Often not, but it depends on what changes. Even when no approval is needed, the work still has to meet the building code, and wet areas must be waterproofed to the Australian Standard.

Usually no approval

Internal work that does not touch the structure, such as a like-for-like kitchen or bathroom renovation, can be exempt development in NSW.

A CDC or a DA

Removing or altering load-bearing walls, new or larger openings in external walls, adding floor area, or any work on a heritage-listed home. Many of these can go through as complying development; others need a DA.

BASIX

If the work needs approval and costs $50,000 or more, a BASIX certificate is needed too.

Things that can affect your approval

  • Bushfire-prone land: a bushfire attack level (BAL) assessment sets the construction standard.
  • Flood-affected land: new floor levels may need to sit above the flood planning level.
  • Heritage items and conservation areas: usually a DA, with limits on how the addition looks.
  • Steep or unstable land: council may ask for a geotechnical report.
  • Sewer mains and easements: building over or close to them needs the water authority’s approval (Sydney Water across most of our area).

Local planning rules differ between councils, including Wollongong, Shellharbour and Kiama, so the right approval path is worked out for your block at the design stage.

Cost

What does a renovation cost?

Every renovation is priced from its own scope and specification. These are the things that move the number most:

The scope

One bathroom is a very different job from a whole house.

Moving plumbing

Relocating a kitchen, toilet or shower costs much more than keeping them where they are.

Structural changes

Removing walls means an engineer’s design and a new beam.

Asbestos and lead

Testing, and licensed removal where it is needed.

Hidden conditions

Rot, termites and old wiring found once walls and floors are opened.

Finishes and fixtures

Tiles, tapware, benchtops, cabinetry and flooring.

Approvals

Certifier or council fees, engineering and BASIX, where the work needs approval.

Staging

Keeping part of the house usable while you live there can add time to the job.

You will see a fully broken-down specification list before anything is signed, so you know exactly what is included.

Book a free consultation

Peace of mind

Your protections under NSW law

A written contract

Residential building work over $5,000 (including GST) needs a written contract, and the deposit can be no more than 10% of the contract price.

Home building insurance

For work over $20,000, the builder must give you a Home Building Compensation Fund (HBCF) certificate before asking for a deposit or starting work. It protects you if the builder dies, disappears or becomes insolvent.

Statutory warranties

Building work carries a warranty of six years for major defects and two years for all other defects.

Inspections and sign-off

The certifier inspects approved work at key stages and issues an occupation certificate before the new space is used.

These come from the Home Building Act 1989 and the NSW planning laws.

What our clients say

“We recently engaged Integrate Building Group to complete some renovations at our house. From start to finish, they were professional, reliable and easy to work with. They arrived on time each day, communicated clearly throughout the project, and always left the site clean and tidy at the end of the day. The quality of workmanship was exceptional, with great attention to detail and a high standard of finish. It’s clear they take pride in their work and care about delivering a quality outcome for their clients.”
Janine D.

5.0 on Google

FAQs

Home renovations: common questions

Do I need council approval to renovate?

Often not. Internal work that does not touch the structure, such as a like-for-like kitchen or bathroom renovation, can be exempt development in NSW. Removing load-bearing walls, changing external openings, adding floor area or working on a heritage-listed home needs a complying development certificate (CDC) or a development application (DA).

Can we live at home during a renovation?

For a single room, usually yes. For a whole-house renovation, many people move out for at least part of the job, especially while the bathrooms and kitchen are out of action or asbestos is being removed. Some work can be staged so part of the house stays usable.

Do you renovate kitchens and bathrooms?

We renovate bathrooms, and we build kitchens as part of larger home renovations.

How much does a home renovation cost?

Every renovation is priced from its own scope and specification. The biggest factors are how much of the house is involved, whether plumbing moves, structural changes, asbestos or hidden damage, and finishes. You will see a fully broken-down specification list before anything is signed.

How long does a renovation take?

It depends on the scope, whether approval is needed and what is found when walls are opened, so there is no standard timeframe. Once the design is settled you get a timeline projection with the specification, then a confirmed start date and build timeline before you sign.

What happens if asbestos is found?

It is common in homes built before 1990. Suspect materials are tested before work starts. More than 10 square metres of bonded asbestos, or any friable asbestos, must be removed by a licensed removalist, with a clearance inspection before work continues.

Should I renovate or extend?

If the house has enough space but the layout does not work, renovate. If you need more rooms, extend. Many projects do both: an extension often includes renovating the kitchen and living areas it joins.

Which areas do you renovate in?

We build across Wollongong and the wider Illawarra, Shellharbour, the Kiama region, Wollondilly and the Southern Highlands, as far south as Berry.

Other ways we can help

Where we build

We build across Wollongong and the wider Illawarra, Shellharbour, the Kiama region, Wollondilly and the Southern Highlands, as far south as Berry.

  • Wollongong
  • Illawarra
  • Shellharbour
  • Kiama
  • Wollondilly
  • Southern Highlands
  • Berry

get in touch

Connect with our team for a free consultation with our experienced builders.